High quality paving throughout the precinct.
New footpath extensions for extra pedestrian 'plaza' space and outdoor dining.
New seating, bike racks and bins.
Upgraded drainage.
Six (6) new trees plus ground plantings.
Removal of two (2) small trees to improve pedestrian access.
Changes to traffic direction to improve safety.
Solar bollard feature lighting.
Please note: the increase in pedestrian space requires the removal of seven (7) car parking bays.
Design enquiries
Georgina Hagger
P: 03 8290 1333
E: urbandesign@stonnington.vic.gov.au
Construction enquiries
Mark Sturge
Consultation on the draft concept for design was completed in December 2020.
The final concept design has been developed and construction will begin in 2021.
For details on the consultation process visit Connect Stonnington.